On Demand: March 2021 Chapter Meeting Webcast

Topic:  Building the Selmon West Extension 

Speakers:  Kymberly Graves, Project Information Officer, 24-7 Consulting, LLC

James Drapp, PE, Vice President for HNTB

John Criss, PE, Senior Project Engineer for Atkins North America

Topic Overview:  
In this interactive presentation, members of the Selmon West Extension project team will discuss the phases of building the $230M bridge that 
will provide connectivity between Hillsborough and Pinellas Counties
.

Speaker Bios:

Kym Graves photo

Kym is a 16+ year veteran of multimedia and public communications and 6 years managing strategic public relations for large roadway and bridge construction projects. She is currently a Project Information Officer for the Selmon West Extension located in South Tampa, owned and operated by the Tampa-Hillsborough Expressway Authority (THEA).
For the last 2.5 years, Kym has served a key role in the public involvement aspect in the construction of the Selmon West Extension.  She has developed numerous Community Awareness Plans in all stages of project development. Kym has served on numerous projects from PD&E through Construction phases. She’s currently working on pursuing her Project Management Professional Certification and is a member of the PMI Tampa Bay Chapter.

James Drapp photo

James Drapp is a vice president in HNTB’s Tampa office. He has 37 years of experience coordinating all design and production efforts associated with roadway design, including project development and environment (PD&E) studies, horizontal and vertical geometrics, interchange and intersection design, traffic control plan (TCP), cross-sections, drainage design and drainage structures, CADD and post-design services.

Throughout his career, Jim has participated in the management and design of numerous Florida Department of Transportation (FDOT) roadway projects and has extensive post design and expert witness services experience. His large project experience includes the $12.5 million design of the I-275/I-4 downtown interchange safety and operational improvements for the Florida Department of Transportation (FDOT) in Tampa and currently serves as Program Manager to Tampa-Hillsborough County Expressway Authority (THEA) through HNTB’s GEC contract.

John Criss photo

John Criss has a Bachelor of Science Civil Engineering (BSCE) as well as a Master’s of Civil Engineering (MCE) from the University of South Florida.  He is a registered Professional Engineer and Certified Building Contractor in Florida. John has 30 years of bridge design, bridge inspection, and highway construction experience. He served 5 years as the Atkins Tampa Structures Design Office Manager before returning to construction and is currently the Senior Project Engineer for the Selmon West Extension Project, owned and operated by the Tampa-Hillsborough Expressway Authority (THEA).

It is no longer possible to register for this event

It is no longer possible to register for this event

Information

Type of category: Chapter Membership Meeting

Date: March 18th, 2021

Hour: 6:30PM to 7:45PM

Registration close date: March 18th, 2021 at 6:00PM

# of PDUs:0

Price

Students: $10.00

- Members: $10.00

- Non members: $10.00